Water & Environment
Lakeside promenade with lamp posts at sunrise

Project Overview

Development of Sama Lake in northern Vadodara, awarded six months after Kamlanagar and run alongside it. From December 2014 the company had two lake sites active simultaneously in different parts of the city, each with its own access constraints, community interface, and material logistics — rising to three within a fortnight as the Gotri contract began.

Scope of Work

  • Water body rehabilitation
  • Edge treatment & public realm
  • Concurrent multi-site city delivery
  • WHY THIS PROJECT STANDS OUT Two lakes live at once, in different corners of the city.
All Projects

Project Details

  • ClientVadodara Municipal Corporation (VMC) — Lake Development
  • LocationVadodara City
  • PeriodDec 2014 – Jan 2017
  • Duration~26 months
  • StatusCompleted
Enquire About This Work
Talk to Our Engineers

Planning Your Next Project?

Partner with Mangalam Construction Co. – Engineers & Contractors and build with confidence. Share your scope and our engineers will come back with a detailed proposal.